A pharmaceutical manufacturing facility is developing a pollution prevention plan to address solvent waste from a synthesis process. Current operations generate 2,400 kg/month of spent methanol waste. The facility has identified four potential approaches: reducing raw material losses through improved process controls (estimates 30% waste reduction), implementing a membrane filtration system to separate and reuse methanol (estimates 75% recovery), switching to a water-based synthesis method (eliminates methanol use but increases energy consumption by 40%), or pre-treating waste to reduce toxicity before disposal. According to Pollution Prevention Act principles, which approach should receive PRIMARY consideration?